Service
Mechanical Engineering
Boiler systems, process engineering, LP/HP compressors, refrigeration and production-line installation, repair and maintenance.
Overview
We own this discipline end to end — scoping the work, engineering it on paper, building it with our own crews and bringing it to a commissioned, signed-off state. No sub-contracted hand-offs means accountability sits with one team from the first drawing to the final test.
Boiler systems, process engineering, LP/HP compressors, refrigeration and production-line works — we install, repair and maintain the mechanical plant that keeps industrial lines running. Pipework is fabricated to suit the real routing, pressure-tested and commissioned, then handed over with the test sheets and operating records the plant team needs to maintain it with confidence.
Our work spans Kampala and Uganda's industrial corridors — from Coca-Cola's HUSKY/SACMI preform lines at Namanve to medium-voltage connections at the Masanafu roundabout and plant at Kakira. Wherever the job sits, the standard is the same: built to specification, inspected before energising, and documented for the people who run it after we leave.
What we deliver
- Boiler systems: specification, installation, repair and maintenance
- Process engineering and production-line installation and relocation
- LP and HP compressor supply, pipework and commissioning
- Refrigeration and cooling plant installation and servicing
- Pump sets, valves and rotating-equipment alignment
- Pipework fabrication, pressure testing and insulation
- Preventive maintenance schedules and breakdown response
- Mechanical handover with test sheets and operating documentation
Process
How we deliver
-
01
Scope & design
We define the scope, model the loads and produce the drawings — single-line diagrams, schedules and detailed designs — so the build is resolved on paper before work starts on site.
-
02
Fabrication & build
Panels, steel and containment are fabricated by our own crews to the as-found conditions, assembled and quality-checked on the bench before they ever see site power.
-
03
Installation
Every circuit, connection and member is installed, terminated, torqued and labelled against the schedule, so the as-built matches the design line for line.
-
04
Commissioning & handover
We test, energise and prove the installation against its start-up sequence, then hand over full documentation — drawings, test sheets and an as-built record.
Projects
Selected work
-
01
HUSKY 1 — Electrical Installation, CCBU Rwenzori Plant
Full electrical installation for the Husky 1 preform line: cable management, transformer, generator, sync panel, APFC and main distribution panel, LV/MV cabling and commissioning.
View project -
02
HUSKY 2 — Electrical Installation, CCBU Rwenzori Plant
Electrical installation for the Husky 2 line: Generator 2, sync panel, APFC 2, splitter and Main Distribution Panel 2, an automatic transfer switch, MV/LV cabling and commissioning.
View project
Have a Mechanical Engineering brief? Tell us what you're building.
Send us the scope and we will respond within 24 hours — scoped, costed and ready to build.
Request a quote