Overview
TES installed the mechanical side of a beverage filling and bottling plant — positioning, levelling and connecting the rotary filler/capper, process vessels, skids and associated piping so the line could be brought into production.
The same team handled the supporting fabrication, so equipment, pipework and access steel were fitted together rather than handed between trades.